News

News

Construction Base

Opening of the Wind Farm Construction Base

5 February 2021
EnergyGE Renewable EnergyMREBanc de Guérande Wind FarmSaint-Nazaire
Installed close to the east lock, on the Quai de Kribi quay in Saint Nazaire, the construction base for the wind farm facility to be sited off Saint Nazaire was opened on 4th February.
Trois grues destinées aux filières agroalimentaires, industrielles et EMR

Three Cranes for the Agri-Food, Industrial and MRE Sectors

10 December 2020
Three new latest-generation Liebherr port cranes have been received at the Port of Nantes ‒ Saint Nazaire.
Un coup d'œil sur les travaux forme Joubert

A Look at the Work at the Joubert Sluice Dock

7 December 2020
Begun back in August, the operations to reinforce a 250-metre length of quay alongside the Joubert sluice dock to a bearing capacity of 15 tonnes per m² are progressing in Saint Nazaire.
André Drouard

André Drouard at the Head of the Container Terminal Business Unit

1 December 2020
On 15th June of this year, André Drouard joined Nantes ‒ Saint Nazaire Port’s Development Directorate as Assistant Operations Manager for the container and ro-ro terminal business units.
Des solutions logistiques en cours de préparation

Logistics Solutions in the Preparatory Phase

30 November 2020
Nantes ‒ Saint Nazaire Port is currently carrying out preparation work to roll out a 23 000 m² platform at its Montoir de Bretagne port facility.
Q-MAX

1st Call at Montoir de Bretagne by a Q-Max, the World’s Largest LNG Carrier

15 October 2020
At Montoir de Bretagne, the liquefied natural gas terminal operated by Elengy, a part of the ENGIE Group, has just welcomed the Q-Max Al Mayeda, the largest liquefied natural gas (LNG) carrier ever to be received in the Region.